e-Voting Facility

Tirana - Albania
04.2025
  • Design and installation of a modular data center for e-voting infrastructure
  • Integration of UPS and energy storage systems
  • Controlled environment for IT and converged racks
  • Full in-rack fire detection and suppression
  • Unified security system integrating CCTV and access control
  • Huawei FusionModule 800 with 10 racks (7 IT, 1 converged, 2 battery)
  • 40 kW total power capacity with 2 + 1 redundant UPS & VRLA battery racks
  • 4 in-rack precision cooling units forming a sealed cold aisle
  • Automated monitoring and control through DCIM interface
  • Centralized supervision and management via the main DCIM platform