Municipal Data Center

Heraklion
09.2025
  • Design and implementation of a complete data center facility
  • Integration of UPS, cooling, and fire suppression systems
  • Installation of structured cabling with full monitoring capabilities
  • Deployment of biometric access control
  • Interconnection with the organization’s central ICT infrastructure
  • Huawei FusionModule 2000 with N+N redundancy configuration
  • 120 kW total power capacity with redundant distribution and automatic switching
  • Real-time monitoring of power, temperature, humidity, and security
  • Integration of CCTV and access control systems
  • Centralized operation through unified IT and building automation platforms