  • Design and deployment of a modular data center within a highly constrained physical space
  • Implementation of critical power infrastructure with integrated UPS, lithium batteries, smart rPDU and independent generator
  • Deployment of high-availability in-row cooling in N+1 configuration
  • Installation and configuration of iMaster NetECO6000 DCIM platform
  • Fiber interconnection with the organization’s core network and migration of existing equipment to the new data center environment
  • Huawei FusionModule 2000 in single-row layout with cold aisle containment and integrated UPS
  • 330U available capacity across 6 IT racks and 2 network racks
  • UPS5000-E-125K modular UPS with N+1 power modules, 60 kW usable capacity, expandable up to 125 kW
  • Huawei SmartLi battery rack with 8 Energy Storage Modules (76 Ah) and 70 kW independent generator
  • 3× NetCol5000 in-row cooling units in N+1 configuration, total cooling capacity 105 kW
  • NetECO6000 DCIM platform with unified management of sensors, CCTV, biometric access control, smart rPDU, power and cooling