Energy Utilities & Renewable Power

Infrastructure and system integration for energy storage and telemetry projects

Energy providers and RES companies increasingly rely on storage and digital supervision to ensure safe and efficient operation of their facilities.
Layer 1 Technologies operates where power meets technology, delivering integrated solutions for BESS, telecom networks and physical security.

With strong focus on project management and commissioning, we complete subsystem integration inside BESS containers, connect telemetry over optical or wireless networks, and deploy monitoring and control infrastructure. Our technical approach ensures availability, consistency and full documentation at every stage of delivery.

Energy Utilities & Renewable Power

Energy storage and telemetry infrastructure for BESS and renewable facilities

Technical scope & indicative services

  • BESS/ESS (Energy Storage Systems) Infrastructure
    • Project management and technical coordination for BESS subsystem integration, from equipment receipt to full operation.
    • Integration of inverters, HVAC, DC panels, switchgear and monitoring with interoperability checks and safe operation.
    • Installation of sensors, control systems and telemetry (EMS, SCADA, Modbus, TCP/IP) for energy monitoring and control.
    • Acceptance tests (FAT/SAT), commissioning and documentation of measurements, configurations and functional checks.
    • Delivery of complete as-built documentation, electrical drawings, labeling and reports per project specifications.
  • Communications & Monitoring Networks
    • Design and implementation of fiber, Ethernet and wireless links to interconnect plants, substations and BESS sites.
    • Deployment of LoRaWAN/IoT infrastructure to collect data from remote installations and energy fields.
    • Creation of data centers and edge nodes for aggregation, processing and storage of telemetry with redundancy options.
    • Communication quality checks, latency verification and end-to-end connectivity documentation for operational reliability.
  • Physical Security Systems
    • Design and installation of CCTV, video analytics and access control for generation plants, substations and BESS containers.
    • Unification of all security systems in a single monitoring environment for remote control and incident management.
    • Equipment selection based on each site’s risk profile and the provider’s technical requirements.
    • Functional testing, commissioning and handover of a fully operational system with configuration documentation.

Our approach

In BESS projects, Layer 1 Technologies strictly follows project specifications and system requirements, prioritising manufacturer guidelines and correct interconnection of subsystems. Commissioning includes safety checks, communication setups and FAT/SAT acceptance tests with complete documentation.

For telemetry, communications and security, each project is treated as a single system — from the design of IoT and LoRa networks to implementation, configuration and technical support.
Layer 1 applies a unified methodology for documentation, testing and handover, ensuring interoperability and stable operation of all mission-critical infrastructures.

Consistency, attention to detail and compliance with the client’s technical requirements are core principles in every project we deliver.

Layer 1 Technologies completes energy-storage and telemetry projects in line with manufacturer specifications, ensuring technical consistency and interoperability.